Offshore Wind Farm vessels

https://www.cyanrenewables.com/

North Star claims first mover advantage on Chartwell and VARD’s Midi-SOV

image

Source: North Star

A full size CSOV has been delivered from Ulstein Shipyard:

Seen here on sea trail before delivery:


The offshore wind ship Olympic Boreas was handed over from Ulstein shipyard to the Herøy shipping company Olympic this week. PHOTO: OLYMPIC

They managed to squeeze into the narrow harbour in her homeport of Fosnavåg for the naming ceremony held today:


Illustration by Vard.

https://www.dfo.com.tw/?lang=en-US

BTW; Dong Feng has two CSOVs on order at VARD for delivery in 2027:

PS> Not sure which yard in the VARD Group will build these two. (Hulls in Romania, outfitting in Norway, or at Vard Vung Tau, Vietnam)


ULSTEIN SX197 design for Shanghai Electric.


ULSTEIN SX195 design for Shanghai Electric.

The hull for the new cable layer Freja arrive at VARD Langsten for outfitting 24.Aug. 2024:

Contract was signed in March 2023:

Launched from the hull building yard, VARD Tulcea in Romania 09. July. 2024:

Under tow to Norway, 30.July, 2024:


Photos: VARD

A novel design for offshore wind turbine maintenance vessel: