It is quite common to not use a bow painter or stern line when launching and recovering a daughter craft.

I was quite surprised when I first saw it, but it works pretty well. Using a painter can actually make it more dangerous because it slows things down.

But to do it you need a daughter craft with a bow thruster or Volvo penta IPS like this one has, that can have a similar effect to a bow thruster.

You also need to have a highly skilled davit operator and coxwain, you can’t have davit operators who are too slow.

Offshore charging stations for SOVs etc.:

More and more of the HLV fleet is getting busy with transporting Offshore Wind Farm components:


Top: DEME’s Installation vessel ORION alongside the GPO GRACE in Halifax.

Below: GPO EMERALD seen waiting for discharging nearby.


Photos: Harm Jongman (C)

Cable layers with capacity to handle the large diam, HVDC cables used to transmit power from OVF to shore facilities are in demand worldwide. Nexans have ordered a “Nexans Aurora 2.0”:

The upgraded vessel:


PHOTO: SKIPSTEKNISK (ILLUSTRASJON)

Press release from Ulstein:

This new combined transport and installation vessel is ready for her first assignment:


The SEAWAY ALFA LIFT moored at the SIF terminal at Rotterdam Maasvlakte II
Photo: Flying Focus Aerial Photography www.flyingfocus.nl ©

Lots of interest in Cable layers, both for the Offshore Wind Farm industry and for long distance HV Power cables:


Fresh from a job in the US BOKALIFT 2 navigating the Sutors of Cromarty outbound with the first three Monopiles for MORAY WEST OWF. Photo: David Meek (c)

PS> Not sure what “Americanized” mean, other than that it is JA compliant. (??)

https://chartwellmarine.com/

The earliest Wind Turbine Installation Vessel (WTIV)??:


SEA POWER inbound at Great Yarmouth from Windfarm Site in the Southern North Sea 2008. Now it has been renamed KPS GULTEKIN BAY.
Photo: Paul Gowen ©

Built as Ocean Hanne in 1991:

Now KPS GULTEKIN BAY:


The BOKALIFT II with the first 3 monopiles for Moray West.
Photo: Flying Focus Aerial Photography www.flyingfocus.nl ©

JUMBO-SAL-ALLIANCE TAKES THE HELM IN GREEN ENERGY REVOLUTION.

Source: https://breakbulk.news/jumbo-sal-alliance-takes-the-helm-in-green-energy-revolution/

Bernhard Schulte Offshore’s next CSOVs:

Source: Bernhard Schulte Offshore: Steel cutting for first CSOV | Ulstein?