Hello everyone,
I’m now runnig the Phase B of new Offshore Sceme and after reading of the Log Book instructions I still have some doubts regarding the Passive DP days.
The New Scheme says:
“A maximum of 25% DP sea time days can be passive time (maximum of 30 DP sea time days only to be done in Phase B), with 75% of the total DP sea time claimed being done in active mode.“
Does it mean that I can log 15 passive days (25% of Phase B 60 days) and in this case I can log 45 active and 15 passive which will be enough to close out the Phase B and attend DP Simulator?
OR
It is possible to log 30 passive days (25% of all 120 days) and 30 active + 30 passive will be counted for Phase B closing?
Hope to hear from someone who did it recently.
Thanks!