Still waiting for the GoM decommissioning boom to start

as per Maritime Executive, it has the potential to be huge but it has to really get started in earnest!

[B]Summit to Address Fast-approaching Deepwater Challenge[/B]

By MarEx November 20, 2013

The deepwater decommissioning challenge in the Gulf of Mexico is approaching fast, prompting concerns that the industry may be unprepared.

Several very large jackets greater than 10,000 tons and in water depths of around 1,000 ft or more in the Gulf are in Pre-FEED Status for decommissioning.

To date only seven structures have been removed from water deeper than 500 ft in the Gulf of Mexico, but in those depths the same number of structures now stand on expired and terminated leases and will require decommissioning in 2013-2014.

“Removal activity in the deepwater GOM is in its infancy,” writes Prof. Mark Kaiser in this year’s Gulf of Mexico Offshore Decommissioning Report, 2013-14.

There are fears that necessary lifts could exceed the capacity of existing vessels, while reverting to piecemeal removal will be costly, risky and time-consuming.

DecomWorld’s 6th Annual Decommissioning & Abandonment Summit, 10-12 March, 2014 in Houston, will tackle the issue head on, providing delegates with in-depth market forecasts and expert-level perspectives to equip them for the imminent challenges.

Deepwater and floating facility abandonment will be addressed in the pre-conference workshops and exhibition, and will be a prominent theme during the two-day conference, with speakers drawn from regulators and operators including Shell, Chevron and BP.

Obviously there are many players at present to get their share of the work but likely room for more.

Let’s get going here!

Old thread, but only ccaptain will be notified, so I take the change of reviving it.

No more waiting, but whether it will be a boom is left to be seen: