Hello, and greetings from TheNavalArch
We are glad to publish a new article titled Mitigating risks during subsea cable installation
This article talks about the risks associated with subsea cable installation and their mitigation measures.
An excerpt is presented below:
"
An installation project could last from multiple months to up-to 1.5 years. Increased offshore activity, lasting offshore presence, and widespread footprint exposes the cables and CLVs to severe storms as well as fishing activities. Although cables and transmission costs amount to around 20% of total project cost, they may form up-to 80% of total insurance claims. This suggests there is ample knowledge gap in the cable installation industry to be bridged. Cable installation comes with its own set of risks. What are they?
"
To read the full article, please click on the link below.
https://thenavalarch.com/mitigating-risks-during-subsea-cable-installation
Best wishes,
Team TheNavalArch