The overload test for the HLC 295000 crane was due to test it with a load of 5,500 tonnes.](https://www.rivieramm.com/news-content-hub/incident-occurs-as-crane-test-takes-place-on-offshore-installation-vessel-59223) Liebherr said the failure occurred at a load of around 2,600 tonnes, causing a chain reaction.