Offshore Windmill Installation Vessel

Japanese Joint Venture Takes Delivery of New Offshore Installation Vessel:


The vessel is 120 metres long and 45 metres wide, with a maximum capacity of 100 people, equipped with a large, fully-revolving crane with a 1,600-tonne lifting capacity to accommodate larger offshore wind turbines and their foundation structures.

Wind Installation Vessel Wind Orca, seen from an unusual angle


The WIND ORCA parked in Schiedam-Wiltonhaven
Photo Rik van Marle - Schippers Centrale Rotterdam ©