Mariner Shortage

That only counts for 50% of the required time over 1600-GRT.

I haven’t looked it up in a while but just off the top of my head I believe the CFR reference is 46 CFR Part 11.210(d) or something close to that, or at least it used to be. Not sure if it’s changed since then.