The first and so far ONLY FPSO in operation in the US GoM took 15 months to convert in Singapore. Here is a full length video about the conversion:
She is still there:
The first and so far ONLY FPSO in operation in the US GoM took 15 months to convert in Singapore. Here is a full length video about the conversion:
She is still there:
Incorrect. FPSO Turitella is also in the Stones field.
Oh sorry, did I miss that one. She left the yard in Singapore in 2015 and I was not involved.
BTW, she is working for Shell on the Stone Field
I stand corrected; the BW Pioneer was the first, not the only FPSO in the US GoM.