Transocean has installed battery pack on the semisub Transocean Spitsbergen:
Probably not without being forced to do so by Equinor to retain their contract.
Transocean has installed battery pack on the semisub Transocean Spitsbergen:
Probably not without being forced to do so by Equinor to retain their contract.