[QUOTE=~~~;38380]CM1, what was the change in well design that was made at the last hour?[/QUOTE]
The chane on 4/15/20 from a casing tieback design to a tapered casing design. BP also did away with running all the centralizers Halliburton recommended to avoid gas channeling on the cement job.