NTSB Report Genesis River and Voyager Tow

Yeah, there’s a lot in that report.

Could be that the accident rate in the Houston Ship Canal is considered acceptable. Making it safer would require reducing the output of the entire system.

As far the situation with the EOT, a Nabtesco, same one we had. With a fully loaded ship a by-pass order won’t give much more before another load limit of some kind is reached. Just a few RPM at best.