This is a must hear interview. Thanks for posting. Having heard it, I now wonder if there was a sufficient time given in the procedure for allowing the cement to harden before displacing the riser with seawater. [QUOTE=tadwall;32003]First radio interview from someone on the rig:
http://www.marklevinshow.com/Article.asp?id=1790422&spid=32364[/QUOTE]