# Offshore wind news

**URL:** <https://forum.gcaptain.com/t/offshore-wind-news/57031>\
**Category:** Offshore\
**Created:** [October 6, 2020, 10:09pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031 "2020-10-06T22:09:34Z")\
**Posts on this page:** 20\
**Page:** 33

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [February 11, 2025, 11:00am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/647 "2025-02-11T11:00:37Z")

</div>

Meanwhile life goes on in the OWF industry in the rest of the world:

> **[Aker Solutions secures work on German offshore wind project - Splash247](https://splash247.com/aker-solutions-secures-work-on-german-offshore-wind-project/)**
>
> Norway’s Aker Solutions has signed a contract with Dragados Offshore to deliver the steel substructure for the 2GW HVDC converter station for the BalWin1 offshore wind grid connection system in Germany. The HVDC substructures will be fabricated in...

A Spanish company contracts a Norwegian company to design and build the foundation for a converter station at an OWF in German waters in the Baltic for a distribution network in Germany.

And in the UK:

> **[Source Galileo, Portland Port to work together on UK offshore wind farm -...](https://splash247.com/source-galileo-portland-port-to-work-together-on-uk-offshore-wind-farm/)**
>
> European renewable energy company Source Galileo has signed a non-exclusive memorandum of understanding with Portland Port to maximise opportunities for offshore wind development off the Dorset coast. Portland Port has a history of servicing the...

> **[Welcome to Portland Port](https://www.portland-port.co.uk/)**
>
> At the centre of Dorset’s historic and breathtaking coastline, 20 miles north of the English Channel shipping lanes

> **[Home | Source Galileo](https://sourcegalileo.com/)**
>
> The intro text will not display on the frontend of the website but is important to add for SEO reasons. This should not exceed 60 words.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [February 19, 2025, 9:53pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/648 "2025-02-19T21:53:08Z")

</div>

> **[Trump Hostility to US Offshore Wind Reverberates Through Supply Chain](https://gcaptain.com/trump-hostility-to-us-offshore-wind-reverberates-through-supply-chain/)**
>
> Companies that committed to investments in U.S. offshore wind infrastructure and supply chains are scrapping their plans as the projects they were meant to serve face huge setbacks, including President Donald Trump's plan to end federal support.

Project 2025 is working as planned:

> [@](#):
>
> The pullback reflects the trickle-down effect of a dramatic downturn in the [U.S. offshore wind](https://gcaptain.com/tag/us-offshore-wind/) industry over the past two years that has caused lengthy delays, cost increases and even failures of many of the nation’s proposed offshore wind farm projects. It could cost thousands of planned jobs and billions of dollars in investments.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [February 21, 2025, 10:29pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/649 "2025-02-21T22:29:58Z")

</div>

Hand break on hard:

> **[BP puts brakes on New York offshore wind project - Splash247](https://splash247.com/bp-puts-brakes-on-new-york-offshore-wind-project/)**
>
> Energy supermajor BP has formally withdrawn its application for the 320-kilometre-long cable and interconnection plan for its Beacon Wind project located in US federal waters between Cape Cod and Long Island. This follows Beacon Wind’s decision in...

> [@](#):
>
> This is another hit for the US offshore wind industry which is reeling from president Donald Trump’s [ban](https://splash247.com/trump-makes-good-on-promise-to-halt-offfshore-wind/) on new offshore wind leases on the country’s outer continental shelf.

---

<div class="post-metadata">

**Author:** ![Offshoreworker25](https://avatars.discourse-cdn.com/v4/letter/o/67e7ee/32.png) [@Offshoreworker25](https://forum.gcaptain.com/u/Offshoreworker25)\
**Post date:** [February 27, 2025, 10:17pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/650 "2025-02-27T22:17:15Z")

</div>

Hopwfully it can continue to grow. Think there could be issues in the states with trump

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [February 28, 2025, 10:23am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/651 "2025-02-28T10:23:24Z")

</div>

You may hope, but foreign investors is not that hopeful:

> **[EDP Renewables delays US offshore wind project until 2029 over Trump policies...](https://splash247.com/edp-renewables-delays-us-offshore-wind-project-until-2029-over-trump-policies/)**
>
> The US offshore wind sector has suffered another knockdown in its bout with US president Donald Trump after EDP Renewables announced it would be postponing its Southcoast Wind project by four years. Portugal’s EDP Renewables said in its investment...

The four year delay MAY indicate that they are sure Trump will be replaced by somebody more friendly to offshore wind development in 2028.  
Not everybody is that sure though:

> [@](#):
>
> This decision comes only days after French energy major EDF [wrote down $940m](https://splash247.com/edf-takes-940m-hit-as-it-abandons-wind-project-off-new-jersey/) in the value of its stake in the Atlantic Shores wind energy project off New Jersey after its former partner in the project, Shell, did the same last month.
> 
> Last week, energy supermajor BP [withdrew its application](https://splash247.com/bp-puts-brakes-on-new-york-offshore-wind-project/) for the 320-kilometre-long cable and interconnection plan for its Beacon Wind project in US federal waters between Cape Cod and Long Island.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [February 28, 2025, 10:31am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/652 "2025-02-28T10:31:15Z")

</div>

Some may be more optimistic (or pessimistic re:Trump’s longevity in office?):

> **[Cadeler’s newbuild wins work on US offshore wind farm - Splash247](https://splash247.com/cadelers-newbuild-wins-work-on-us-offshore-wind-farm/)**
>
> Copenhagen-headquartered offshore wind installation player Cadeler has signed a firm contract with an undisclosed client for one of its newbuild vessels for work at an offshore wind farm in the United States. This will be the first time Cadeler’s...

> [@](#):
>
> This will be the first time Cadeler’s second P-Class newbuild vessel, _Wind Pace_, will be deployed following its anticipated delivery.  
> The work is scheduled to begin in the second quarter of 2025 and the vessel will be committed under this contract until the first quarter of 2026. This will be the company’s second offshore wind project in US waters.  
> The value of the contract to Cadeler is estimated to be between €67m and €75m ($69.6m and $77.9m).

---

<div class="post-metadata">

**Author:** ![Offshoreworker25](https://avatars.discourse-cdn.com/v4/letter/o/67e7ee/32.png) [@Offshoreworker25](https://forum.gcaptain.com/u/Offshoreworker25)\
**Post date:** [February 28, 2025, 1:58pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/653 "2025-02-28T13:58:10Z")

</div>

Possibly , I know companies were planning on building cable factories in the states have now changed there mind. Could of increased employment in them areas

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [March 1, 2025, 8:38pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/654 "2025-03-01T20:38:41Z")

</div>

ABS continue being actively engaged in the floating offshore wind farm development:

> **[ABS Approves Novel Floating Wind Platform Developed by Aikido Technologies](https://gcaptain.com/abs-approves-novel-floating-wind-platform-developed-by-aikido-technologies/?subscriber=true&goal=0_f50174ef03-3abae28265-169863069&mc_cid=3abae28265&mc_eid=4674ba0fbe)**
>
> ABS has issued a statement of maturity to Aikido’s innovative floating wind platform design, the latest stage in new technology qualification.  As part of the process, ABS witnessed a successful...

> **[Aikido | Making Energy Float](https://www.aikidotechnologies.com/)**
>
> The wind blows everywhere. We get turbines there.

> **[ABS Greenlights XXL Floating Wind Platform Design for Deepwater](https://gcaptain.com/abs-greenlights-xxl-floating-wind-platform-design-for-deepwater/?subscriber=true&goal=0_f50174ef03-3abae28265-169863069&mc_cid=3abae28265&mc_eid=4674ba0fbe)**
>
> The American Bureau of Shipping (ABS) has approved Front-End Engineering Design (FEED) documents for a groundbreaking deep water floating offshore wind platform created by US-based ECO TLP, Inc. and MOCEAN-Offshore...

> **[ecotlp.com](https://ecotlp.com/)**
>
> PATENTED OFFSHORE WIND HYBRID SPAR - TLP INSTALLATION PLATFORM

[https://mocean-offshore.com/](https://mocean-offshore.com/)

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [March 7, 2025, 4:59pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/655 "2025-03-07T16:59:36Z")

</div>

What to do with old disused wind turbine blades have been a problem for some time.  
Now maybe someone has come up with an answer to that problem:

> **[Vattenfall carves out new life for turbine blades on the slopes - Splash247](https://splash247.com/vattenfall-carves-out-new-life-for-turbine-blades-on-the-slopes/)**
>
> As the first generation of turbines reaches the end of their life, thousands of turbines worldwide will be decommissioned or replaced over the next few years and Swedish utility Vattenfall has found an ingenious way of reusing them. Large parts of...

> [@](#):
>
> The company is now partnering with the Norwegian company Gjenkraft which specialises in extracting valuable materials such as fibreglass and carbon fibre from end-of-service blades. These materials can be repurposed in various industries, reducing waste and conserving natural resources.  
> Blades from the decommissioned Dutch wind farm Irene Vorrink were sent to Norway for processing. Vattenfall and Gjenkraft then worked together with Norwegian ski company EVI, known for the use of recycled materials in ski production.

So get out on the ski slops when it is still time.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [March 11, 2025, 10:08pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/656 "2025-03-11T22:08:02Z")

</div>

> **[RWE slashes US offshore wind jobs over Trump’s renewables policies - Splash247](https://splash247.com/rwe-slashes-us-offshore-wind-jobs-over-trumps-renewables-policies/)**
>
> German utility RWE has laid off some of its offshore wind employees in the US following president Donald Trump starting his assault on the industry. RWE employs around 1,500 people in the US and its offshore wind section is headquartered at the...

> [@](#):
>
> In a regulatory filing, RWE Offshore Wind Services, a US subsidiary of the company, stated that it would cut its Boston-area workforce by May 6. The filing revealed a plan to lay off 73 employees.
> 
> The layoffs will mostly affect workers supporting the long-term development of offshore wind projects across the country.  
> “Last year we announced that, due to market conditions and increased risk profile, we would delay certain expenditures related to our US offshore wind development projects. With the current regulatory and political environment, we have decided to reduce the scope of our development activities and the size of our US offshore team,” the company said in a statement.
> 
> RWE currently has one offshore wind project in the US that is at an advanced stage of development, in a joint venture with National Grid, located off the coast of New York.  
> The proposed project will open 700 jobs, deliver up to $300m in wages, and drive some $3bn in economic activity, including over $2bn in direct in-state spending. Community Offshore Wind is also looking to invest up to $250m in developing crucial New York manufacturing facilities, accelerating the growth of the local offshore wind supply chain.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [March 18, 2025, 10:39pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/657 "2025-03-18T22:39:24Z")

</div>

Does this lead back to the middle-ages?:

> **[Permit for New Jersey offshore wind project pulled by Trump's EPA - Splash247](https://splash247.com/permit-for-new-jersey-offshore-wind-project-pulled-by-trumps-epa/)**
>
> The US Environmental Protection Agency (EPA) has revoked a permit for New Jersey’s first offshore wind energy farm potentially stopping it in its tracks. An Environmental Appeals Court Judge remanded a Clean Air Act permit, issued in September last...

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 10, 2025, 9:38pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/658 "2025-04-10T21:38:18Z")

</div>

![image](https://us1.discourse-cdn.com/flex016/uploads/gcaptain_maritime_forum/original/3X/4/4/44eb6c86238b49e307821c0d2d13123ce2291864.jpeg)

> **[Aker Solutions introduces new floating wind foundation designs - Splash247](https://splash247.com/aker-solutions-introduces-new-floating-wind-foundation-designs/)**
>
> Norway’s Aker Solutions has introduced three new floating wind foundation designs, all capable of supporting turbines that are 15MW and larger. The three turbine foundations, all with passive ballast systems, are named the YFloat, CONFloat-Omega, and...

> [@](#):
>
> The YFloat is designed to provide a stable platform for wind turbines. Its symmetrical design facilitates efficient pre-fabrication with the option of local assembly, reducing material usage and simplifying the manufacturing process. It also offers scalability that facilitates higher power generation and reduced levelized cost of energy.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 17, 2025, 7:56pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/659 "2025-04-17T19:56:50Z")

</div>

Governing by “sharpie”?:

> **[Trump administration halts work on Equinor’s wind project off New York -...](https://splash247.com/trump-administration-halts-work-on-equinors-wind-project-off-new-york/)**
>
> The secretary of the US Department of the Interior and chairman of the National Energy Dominance Council, Doug Burgum, has stopped all construction of Equinor’s Empire Wind 1 project off the coast of New York. Burgum said in a social media post that...

> [@](#):
>
> “As Governor, I will not allow this federal overreach to stand. I will fight this every step of the way to protect union jobs, affordable energy and New York’s economic future,” she added.

Anybody wants to invest in US OWF development?:

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 24, 2025, 11:10am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/660 "2025-04-24T11:10:36Z")

</div>

> [@ombugge](#):
>
> Anybody wants to invest in US OWF development?:

[Trump’s Offshore Wind Halt Risks $28 Billion of Investment](https://gcaptain.com/trumps-offshore-wind-halt-risks-28-billion-of-investment/)??

[https://gcaptain.com/equinor-weighs-legal-challenge-to-trump-admins-empire-wind-shutdown/](https://gcaptain.com/equinor-weighs-legal-challenge-to-trump-admins-empire-wind-shutdown/)??

Meanwhile, in the UK:

> **[UK government investing $400m to strengthen offshore wind supply chain -...](https://splash247.com/uk-government-investing-400m-to-strengthen-offshore-wind-supply-chain/)**
>
> The UK government will invest £300m ($400m) through Great British Energy to strengthen the country’s offshore wind manufacturing capabilities and supply chains. The investment is expected to directly and indirectly mobilise billions in additional...

> [@](#):
>
> The new investment in domestic offshore wind is part of the UK’s modern industrial strategy and ensures that the clean energy future is ‘built in Britain’. The funding will ensure that the nation builds resilient domestic supply chains for components which are essential to delivering clean power by 2030.

How stupid is it possible to be, wasting time and money on developing clean energy, when you can encourage more oil and gas exploration?

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 27, 2025, 11:50am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/661 "2025-04-27T11:50:55Z")

</div>

Not ONLY offshore

> **[Wind industry installs record capacity in 2024 despite policy instability](https://www.gwec.net/gwec-news/wind-industry-installs-record-capacity-in-2024-despite-policy-instability)**
>
> This year's Global Wind Report from the Global Wind Energy Council is out now!

> [@](#):
>
> he 2025 Global Wind Report includes data from every region of the world. Last year’s growth – 109 GW of new onshore wind and 8 GW of offshore wind - brings global cumulative capacity of wind energy to 1,136GW, spread across all continents, with 55 countries installing wind turbines last year.
> 
> In 2024, China led the way for new installations ahead of the USA, followed by Germany and India, respectively, with Brazil rounding out the Top 5. Those same five markets now make up the top five for total installations, as of the end of 2024, with Brazil moving past Spain.
> 
> There was record growth in other regions. The **Asia-Pacific region saw a 7% year-on-year growth rate** , while **Africa & Middle East saw a 107% y-o-y growth** rate, thanks to Egypt installing 794 MW and Saudi Arabia’s 390 MW.  
> North America, LATAM and Europe experienced a decline in new installations compared with 2023.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 28, 2025, 11:19am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/662 "2025-04-28T11:19:36Z")

</div>

Who wants to invest in US OWFs now?:

> **[RWE stops all US offshore wind activities due to political climate - Splash247](https://splash247.com/rwe-stops-all-us-offshore-wind-activities-due-to-political-climate/)**
>
> German utility RWE has frozen all of its US offshore wind operations due to the political environment created by the administration of current president Donald Trump. In November last year, while the campaign for the new US president was still hot,...

> [@](#):
>
> After Trump took office and started his crusade against offshore wind, RWE revealed that it would be scaling back its operations in the US and that it would lay off some of its offshore wind employees.
> 
> RWE Offshore Wind Services, a US subsidiary of the company, said at the time that it would cut around 73 employees from the Boston area. The layoffs mostly affected workers supporting the long-term development of offshore wind projects across the country.
> 
> Due to the US political developments, Krebber stated that the company would be more stringent regarding requirements for future US investments.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [May 1, 2025, 11:29am UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/663 "2025-05-01T11:29:16Z")

</div>

![image](https://us1.discourse-cdn.com/flex016/uploads/gcaptain_maritime_forum/original/3X/7/7/775bd00bc18ade9c09736f7546a7bd8297907981.jpeg)  
Photo: EnBW

> **[The first giant 15 MW turbine is up at Germany’s largest offshore wind farm](https://electrek.co/2025/04/28/the-first-giant-15-mw-turbine-is-up-at-germanys-largest-offshore-wind-farm/)**
>
> Germany's largest offshore wind farm, He Dreiht, just installed the world's first Vestas 15 MW turbine — a step toward 960 MW of clean power.

> [@](#):
>
> Germany’s largest offshore wind farm under construction, EnBW’s He Dreiht, just hit a big milestone: The first enormous turbine is now up in the North Sea.  
> He Dreiht – which means “it spins” in Low German – is using Vestas’s massive 15 megawatt (MW) turbines, the first project in the world to install them.
> 
> He Dreiht is located about 85 kilometers (53 miles) northwest of Borkum and 110 kilometers (68 miles) west of Helgoland. At peak times, more than 500 workers will be out at sea building the farm, using a fleet of more than 60 ships. EnBW’s offshore team in Hamburg is running the show.
> 
> The installation process is a major operation. The 64 foundations were already set in the seabed last year. Parts for the turbines are loaded onto the installation vessel _Wind Orca_ in Esbjerg, Denmark, and shipped out in a 12-hour journey to the construction site. From there, the turbines are lifted into place. Meanwhile, crews are also working on internal wind farm cabling.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [May 2, 2025, 1:49pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/664 "2025-05-02T13:49:52Z")

</div>

What has she done!!! Don’t she know what happen when somebody criticise any Trump policy?:

> **[Trump energy official concedes Empire Wind halt was 'dangerous' - Splash247](https://splash247.com/trump-energy-official-concedes-empire-wind-halt-was-dangerous/)**
>
> Leslie Beyer, Donald Trump’s nominee for a top Interior Department position, has agreed that the recent order to stop work on Equinor’s Empire Wind project sent “a dangerous message” to developers. Beyer, nominated as assistant secretary of the...

> [@](#):
>
> Beyer, nominated as assistant secretary of the interior, lands and minerals management, was asked by senator Angus King during a confirmation hearing about the administration putting a stop to Equinor’s fully-permitted 810MW offshore wind project.
> 
> A few days ago Equinor chief executive Anders Opedal said in a quarterly earnings statement that the company would be seeking to engage directly with the US administration to clarify the matter regarding the $2.5bn offshore wind project, as well as consider its legal options.  
> “We have invested in Empire Wind after obtaining all necessary approvals, and the order to halt work now is unprecedented and in our view unlawful,” Opedal said.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [May 7, 2025, 1:17pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/665 "2025-05-07T13:17:08Z")

</div>

More problems in the OWF industry:

> **[Ørsted shelves 2.4GW UK offshore wind project over rising costs - Splash247](https://splash247.com/orsted-shelves-2-4gw-uk-offshore-wind-project-over-rising-costs/)**
>
> Danish offshore wind developer Ørsted has discontinued the Hornsea 4 offshore wind project in the UK, citing rising costs and increased risks for development. The Danish firm said that, since the contract for difference (CfD) award in September 2024,...

> [@](#):
>
> Ørsted claimed that this increased the execution risk and deteriorated the value creation of the project, so the company decided to stop further spending at this time and terminate the project’s supply chain contracts. This means that the offshore wind developer will not deliver Hornsea 4 under the CfD awarded in allocation round 6.
> 
> He added that the adverse macroeconomic developments, continued supply chain challenges, and increased execution, market, and operational risks have eroded the value creation.
> 
> “We’ll keep the project rights for the Hornsea 4 project in our development portfolio, and we’ll seek to develop the project later in a way that is more value-creating for us and our shareholders,” Errboe concluded.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [May 13, 2025, 12:28pm UTC](https://forum.gcaptain.com/t/offshore-wind-news/57031/666 "2025-05-13T12:28:39Z")

</div>

> **[Equinor could axe wind project off New York within days - Splash247](https://splash247.com/equinor-could-axe-wind-project-off-new-york-within-days/)**
>
> Norwegian energy giant Equinor is considering terminating its 810MW Empire Wind wind farm off Long Island due to the Trump administration putting a halt to the construction of the project. Interior secretary Doug Burgum directed the US Bureau of...

> [@](#):
>
> Some democrats claimed the stoppage of the project would have a “chilling effect” on developers. Even Leslie Beyer, Donald Trump’s nominee for the assistant secretary role in the Department of the Interior, agreed during her confirmation hearing that the order to stop work on the Empire Wind project sent “[a dangerous message](https://splash247.com/trump-energy-official-concedes-empire-wind-halt-was-dangerous/)” as companies needed certainty in the permitting system so they could make financial investment decisions.
> 
> Molly Morris, president of Equinor Renewables Americas, said that Equinor had already invested over $2.5bn in the project and that the stoppage caused an “urgent, unsustainable situation”, which is costing the company up to $50m per week. Those costs include 11 vessels on standby.
> 
> Morris and Equinor CEO Anders Opedal did have a meeting with the director of the US National Economic Council, Kevin Hassett, last week to try and resolve the issue. However, the Equinor officials were not able to arrange a meeting with Interior secretary Burgum, who is the man responsible for the issue.

[Previous page](https://forum.gcaptain.com/t/offshore-wind-news/57031.md?page=32)

[Next page](https://forum.gcaptain.com/t/offshore-wind-news/57031.md?page=34)
