# Baltimore port to open deeper channel, enabling some cargo ships to pass

**URL:** <https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256>\
**Category:** Maritime News\
**Created:** [April 24, 2024, 11:09am UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256 "2024-04-24T11:09:54Z")\
**Posts on this page:** 6\
**Page:** 1

<div class="post-metadata">

**Author:** ![Kennebec\_Captain](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/kennebec_captain/32/13_2.png) [@Kennebec\_Captain](https://forum.gcaptain.com/u/Kennebec_Captain)\
**Post date:** [April 24, 2024, 11:09am UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/1 "2024-04-24T11:09:55Z")

</div>

> **[Baltimore port to open deeper channel, enabling some cargo ships to pass...](https://apnews.com/article/baltimore-bridge-collapse-new-channel-e7bdfc8ba58a7263679bc574550a6625)**
>
> The Port of Baltimore is preparing to open a deeper channel for commercial ships to get in and out for a few days.

Good news for port workers.

Newly opened channel has a depth of 35 feet.

> Five of the seven cargo ships that have been stuck in Baltimore’s harbor will be able to pass through the new channel, including one loaded car carrier, officials said Tuesday, marking one month since the deadly disaster. Other ships are scheduled to enter the port, which normally processes more cars and farm equipment than any other in the country.

[Another report - from the Army.](https://www.army.mil/article/275595/u_s_army_corps_of_engineers_clears_wreckage_from_limited_access_channel_in_port_of_baltimore)

> The LAC is planned to have a controlling depth of at least 35 feet, a horizontal clearance of 300 feet, and a vertical clearance of 214 feet. The Captain of the Port will permit transit within the LAC with restrictions as described in MSIB 043-24, including weather limitation which may impact that transit window. When deemed operational, the LAC is expected to provide passage for a limited number of commercial vessels into the Port of Baltimore and a departure opportunity for some deep draft vessels currently unable to leave the harbor since the bridge collapse.

Expeted to be opened tomorrow, 25 Apr.

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [April 29, 2024, 10:29am UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/2 "2024-04-29T10:29:18Z")

</div>

> **[Removal of the Dali takes centre stage in this week’s salvage operations in...](https://splash247.com/removal-of-the-dali-takes-centre-stage-in-this-weeks-salvage-operations-in-baltimore/)**
>
> After a five-week hiatus, containerships have started to call again at the port of Baltimore on the US east coast. Yesterday saw the arrival of the 2,872 teu MSC Cargo Passion III, able to navigate its way to berth through a recently opened 12 m deep...

> [@](#):
>
> According to a release by the authorities leading the port’s clean-up operations issued on Friday, one month to the day since this year’s most high-profile shipping accident, 171 commercial vessels had transited the four alternate channels.
> 
> To address the **estimated 50,000 tons of wreckage** at the Francis Scott Key Bridge site, the Unified Command has assembled a substantial fleet of diverse vessels and equipment which includes 36 barges, 27 tugboats, 22 floating cranes, 10 excavators, one dredger, one skimmer, and three Coast Guard cutters. As of three days ago, **more than 3,000 tons of wreckage and debris had been removed** from the site for disposal or recycling.

---

<div class="post-metadata">

**Author:** ![Kennebec\_Captain](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/kennebec_captain/32/13_2.png) [@Kennebec\_Captain](https://forum.gcaptain.com/u/Kennebec_Captain)\
**Post date:** [May 1, 2024, 10:23am UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/3 "2024-05-01T10:23:46Z")

</div>

It’s going to be a big job overall but the focus for now is going to be restoring the main channel to the controlling depth of 50 feet (15 meters).

Reporting now is that the main channel is expected to be open on or about 10 May with depth of 45 feet (14 meters).

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [May 1, 2024, 1:31pm UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/4 "2024-05-01T13:31:43Z")

</div>

> **[Dali boxship to be removed by May 10 - Splash247](https://splash247.com/dali-boxship-to-be-removed-by-may-10/)**
>
> Officials expect to have removed the Dali containership from its lodged position in Baltimore port by May 10. The 9,962 teu ship took out the Francis Scott Key Bridge on March 26 and has been wedged onto the bed of the Patapsco River ever...

> [@](#):
>
> Once the _Dali_ returns to port, officials said they expect to open a 13.7 m channel by May 10 with the aim to fully restore the port’s 15 m deep main channel by the end of May.

---

<div class="post-metadata">

**Author:** ![freighterman1](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/freighterman1/32/11176_2.png) [@freighterman1](https://forum.gcaptain.com/u/freighterman1)\
**Post date:** [May 1, 2024, 9:47pm UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/5 "2024-05-01T21:47:09Z")

</div>

Bad news has a hundred echoes.  
Good news dies on the wind.  
(puerto rican proverb)

---

<div class="post-metadata">

**Author:** ![ombugge](https://sea2.discourse-cdn.com/flex016/user_avatar/forum.gcaptain.com/ombugge/32/11217_2.png) [@ombugge](https://forum.gcaptain.com/u/ombugge)\
**Post date:** [June 5, 2024, 12:03pm UTC](https://forum.gcaptain.com/t/baltimore-port-to-open-deeper-channel-enabling-some-cargo-ships-to-pass/69256/6 "2024-06-05T12:03:32Z")

</div>

> **[Baltimore port expected to open full main shipping channel this weekend -...](https://splash247.com/baltimore-port-expected-to-open-full-main-shipping-channel-this-weekend/)**
>
> The full 213 m wide main shipping channel into Baltimore port will open this weekend some 75 days since the 9,962 teu Dali containership lost power, slammed into a bridge and cut off operations at most of America’s ninth largest port.  Crews...

> [@](#):
>
> Crews lifted the last large piece of the downed Francis Scott Key Bridge blocking the Patapsco River’s main shipping channel yesterday morning.  
> Key Bridge Response Unified Command crews are now set to use dredging buckets and a large salvage grab to pull smaller chunks of debris out of the water before reopening the full channel this weekend.
> 
> Plans are being drawn up to get a replacement bridge up and running by 2028,
